Catholic University of America: Upper Field Complex

CUA soccer field.jpg

Washington, DC
221,533 SF; $8 Million 
Client: SmithGroup JJR
Owner: Catholic University of America
Role: Cost Estimating

This project consists of a multi-purpose stadium primarily for recreation and varsity soccer with a turf field, lights, and 700 seats for spectators, another multi-purpose stadium for recreation and field hockey with a turf field lights, and seats for spectators, a small restroom and concessions facility, and handicapped / VIP surface parking lot. Hanscomb Consulting is providing design phase estimating on the Catholic University Upper Field complex project to include one estimate at each of the concept (ROM), Schematic Design, Design Development, and Construction document phases.